This guide is for Toronto owners, neighbours and small builders who want to know which rules come from the Province and which come from the City. Ontario changed the Planning Act and the City of Toronto Act in 2022, 2024 and 2025, and made regulations that override parts of Toronto's zoning by-law on house lots. The guide covers Bill 23 and its three units per lot, Bill 185, Ontario Regulation 462/24, and the 10 percent setback rule that came from Bill 17. Every fact comes from an Ontario Environmental Registry notice or a City of Toronto page read on November 17, 2026.

Written by · Updated November 17, 2026 · 10 min read

Key takeaways

  • Bill 23, the More Homes Built Faster Act, 2022, received Royal Assent on November 28, 2022 and allows up to three homes per lot as-of-right on serviced urban land: two in the main building and one in a building at the back.
  • For those extra homes, municipalities cannot charge development charges or parkland fees, cannot require more than one parking space per unit, and cannot set a minimum unit size beyond the Building Code.
  • Toronto's own zoning goes further on unit counts: four homes in one building city-wide, and six in the Toronto and East York District and Ward 23.
  • Ontario Regulation 462/24, in force November 20, 2024, allows at least 45 percent lot coverage and sets aside floor space index and angular plane limits on lots with up to three homes.
  • Bill 185, with Royal Assent on June 6, 2024, removed minimum car parking in Major Transit Station Areas and limited who can appeal official plans and zoning by-laws.
  • After Bill 17, a design within 10 percent of a required setback on urban residential land outside the Greenbelt can proceed without a minor variance, with exceptions such as hazard lands and land near shorelines and railways.

Two sets of rules on every lot

Every house lot in Toronto sits under two sets of rules. The City writes the zoning by-law, which sets how tall a building can be, how far it sits from the lot lines and how many homes it may hold. The Province writes the laws the City must follow: the Planning Act, which applies to every Ontario municipality, and the City of Toronto Act, 2006, which sets out Toronto's own powers. When the Province changes those laws or makes a regulation under them, part of Toronto's zoning can stop applying on the day the change takes effect.

Since 2022, the Province has done this several times. Owners see the result as a confusing list of bill numbers in the news. I am Anthony Palleschi, a real estate sales representative with Weiss Realty Ltd., Brokerage, and this guide sets the laws side by side so an owner, a neighbour or a builder can see which rule came from where. It is part of the Missing Middle section. The City's own rules for each home type are in the guides for secondary suites, garden suites and laneway suites, and the unit counts for multiplexes are in the multiplex zoning guide.

Each change below is described in a notice on the Environmental Registry of Ontario, the Province's public website for proposals and decisions. The notices summarise the laws. A lawyer or the City's zoning examiner reads the statute itself before a decision depends on it.

The laws at a glance

Ontario laws and regulations that change the rules on Toronto house lots, from Environmental Registry of Ontario decision notices and the City of Toronto's Expanding Housing Options page, read November 17, 2026
Law or regulationDateWhat it changed on house lots
Bill 23, More Homes Built Faster Act, 2022Royal Assent November 28, 2022Up to three homes per lot as-of-right; no development charges or parkland fees on those homes; site plan control exemption up to 10 units
Bill 185, Cutting Red Tape to Build More Homes Act, 2024Royal Assent June 6, 2024No minimum car parking in Major Transit Station Areas; fewer appeals of zoning by-laws; power to remove zoning barriers to added homes
Ontario Regulation 462/24, amending Regulation 299/19In force November 20, 2024At least 45 percent lot coverage; no floor space index or angular plane limits; building separation capped at 4 metres, on lots with up to three homes
Bill 17, Protect Ontario by Building Faster and Smarter Act, 2025Royal Assent June 5, 2025Power to allow setback variations as-of-right
Amendment to Ontario Regulation 545/06Decision posted November 24, 2025A design within 10 percent of a required setback is allowed as-of-right on eligible urban residential land

Bill 23: three homes per lot

The More Homes Built Faster Act, 2022, known as Bill 23, received Royal Assent on November 28, 2022. The Province's Environmental Registry notice on its Planning Act and City of Toronto Act changes says it strengthened the framework for additional residential units, the Province's term for a second or third home on a house lot, by permitting up to three units per lot as-of-right, meaning without a rezoning. Two of the units may be in the main building and one in an ancillary building, a smaller building on the same lot.

The rule applies province-wide on land where residential use is permitted, in settlement areas with full municipal water and sewage services. Toronto's residential areas are serviced urban land.

The same notice lists what municipalities can no longer require for these units:

  • A minimum unit size beyond what the Building Code sets.
  • More than one parking space per unit.
  • Development charges, parkland dedication or cash in lieu of parkland.

Two more changes in Bill 23 apply to small buildings. All aspects of site plan control, the City's review of how a building sits on its site, no longer apply to residential projects of up to 10 units. And third-party appeals of minor variances and consents were limited, which narrows a neighbour's right to appeal a decision of the Committee of Adjustment. Appeal rights for official plans and zoning by-laws stayed in place at that time.

Bill 23 is also the law that set Toronto's housing target of 285,000 new homes by 2031. The housing target guide explains that target and how it is counted.

Toronto's rules on top of the Province's

The provincial rule is a minimum. Toronto allows more. The City's Expanding Housing Options in Neighbourhoods page, modified September 2, 2026, says Council adopted rules in May 2023 to permit multiplexes city-wide, with up to four units in one building. Six-unit buildings are allowed in the Toronto and East York District and Ward 23. Garden suites and laneway suites come from the City's own chapters of the zoning by-law.

So on a Toronto lot the unit count usually comes from the City, while some of the size limits on a lot with up to three homes come from the Province. An owner who adds a basement apartment and a garden suite has three homes on the lot. That brings in the provincial rules below. A builder who plans a fourplex is outside the three-home rules and works with the City's multiplex standards.

Ontario Regulation 462/24: size limits on lots with up to three homes

Bill 185 gave the Minister power to remove zoning barriers to added homes, and the Minister used it in a regulation. The City's page says Ontario Regulation 462/24 came into force on November 20, 2024. It amended Ontario Regulation 299/19, the regulation on additional residential units.

The Province's decision notice on the changes to Regulation 299/19, posted December 4, 2024, says the changes apply to urban residential land that permits up to three units per lot. They do not apply in rural areas or in settlement areas without full municipal servicing. On a lot where they apply, the regulation:

  • Overrides every angular plane rule in the zoning by-law for buildings with additional units. An angular plane is a sloped line drawn from a lot line that a building may not cross.
  • Allows at least 45 percent lot coverage for all buildings and structures on the lot. Where the City's zoning allows more, the City's figure stands.
  • Overrides every floor space index rule for the lot. Floor space index compares a building's floor area with the lot's area.
  • Overrides minimum lot size rules that apply to lots with additional units.
  • Caps any required separation between a building with additional units and another building on the lot at 4 metres.

The City's page says staff would consider the regulation's effect as part of the monitoring of garden suites and multiplexes. The Missing Middle page answers how the regulation applies to a lot that ends up with three homes.

Bill 185: parking near transit and fewer appeals

The Cutting Red Tape to Build More Homes Act, 2024, known as Bill 185, received Royal Assent on June 6, 2024. The Province's decision notice on Bill 185, posted June 20, 2024, lists these changes to the Planning Act:

  • No minimum parking requirement for land, buildings or structures in Protected Major Transit Station Areas and Major Transit Station Areas, the areas the Official Plan draws around subway, LRT and GO stations. The change does not apply to bicycle parking, and where a project provides parking, the accessible parking rules under the Accessibility for Ontarians with Disabilities Act still apply.
  • New limits on who can appeal official plans, official plan amendments, zoning by-laws and zoning by-law amendments. The notice lists the groups that keep appeal rights: landowners whose land the matter applies to, operators of certain facilities near employment areas, aggregate licence holders, NAV Canada and certain airport operators, and public hospitals.
  • Power for the Minister to remove zoning barriers to small multi-unit buildings, with limits on lot coverage and on bedrooms per lot named as examples.
  • Tools for municipalities to manage water and sewage servicing for approved projects that have not started, and lapsing conditions on some approvals.

On house lots in Toronto, parking had already changed under the City's own rules. Multiplexes have not had to provide parking since February 3, 2022, according to the City's multiplex pages. The parking rules are collected in the parking guide.

Bill 17 and the 10 percent setback rule

The Protect Ontario by Building Faster and Smarter Act, 2025, known as Bill 17, received Royal Assent on June 5, 2025. The Province's notice on Schedules 3 and 7 says it gave the Province power to allow setback variations as-of-right, so that a design within a set percentage of a required setback on certain urban residential land could proceed without a Committee of Adjustment hearing. The notice names basement suites as one kind of home the change is meant to help.

The Province then set the percentage. Its decision on as-of-right variations from setback requirements, posted November 24, 2025, says Ontario Regulation 545/06 was changed so that a proposal within 10 percent of the required setback is permitted as-of-right. The Province gave this example: a required front setback of 5 metres would work as 4.5 metres.

The lands are limited. The notice says the rule covers parcels of urban residential land outside the Greenbelt Area, and excludes areas such as hazardous lands and land near shorelines and railways. A setback is the only standard it covers. A design that also exceeds the height, the length or the floor area limit still needs a minor variance for those. The severance and minor variance guide explains that process.

What this means for an owner, a neighbour and a builder

For an owner, the provincial rules make a second and third home easier to fit on a lot. A lot that could not take a garden suite under an old floor space limit may take one now, if it meets the City's suite rules and the lot ends up with three homes or fewer. Ask the City for a Preliminary Zoning Review before paying for full drawings.

For a neighbour, the main change is in notice and appeals. A design that fits every rule, including the provincial overrides, goes straight to a building permit with no hearing. A design that needs a variance still goes to the Committee of Adjustment, but Bill 23 limited third-party appeals of its decisions.

For a builder, the useful question is which rule set governs the project. Three homes or fewer brings in Regulation 462/24. Four to six homes in one building is the City's multiplex standard. A design within 10 percent of a setback on eligible land avoids one variance. The guide to screening a lot turns these into checks before an offer.

A family buyer looks at the house. A builder looks at the lot and asks which set of rules gives it the most homes. The answer can change what the lot is worth to each of them.

Questions to ask about your own lot

  • Will my lot end up with three homes or fewer, so Regulation 462/24 applies?
  • Does my design meet the City's own rules for the home type I want, such as the garden suite chapter?
  • Is my lot inside a Major Transit Station Area, where no minimum car parking applies?
  • Is any setback in my design within 10 percent of the required distance, and is my lot excluded from that rule?
  • Which other zoning standards would still need a minor variance?
  • Would a builder count more homes on my lot than I would?

There is no obligation to sell or to build. If you want to know which rules apply to your lot, the contact page reaches me directly.

Planning and development potential is property-specific and subject to zoning, approvals, site conditions, municipal review and other due diligence. This guide is illustrative and does not guarantee similar permissions or outcomes for another property.

Frequently asked questions

What Ontario law allows three homes on one lot?

Bill 23, the More Homes Built Faster Act, 2022, which received Royal Assent on November 28, 2022. The Province's Environmental Registry notice on its Planning Act and City of Toronto Act changes says it permits up to three units per lot as-of-right, meaning without a rezoning: two in the main building and one in an ancillary building. It applies where residential use is allowed in settlement areas with full municipal water and sewage services.

Can Toronto allow more homes on a lot than the Ontario law does?

Yes. The provincial rule sets a minimum that municipalities must allow. Toronto's zoning allows more: the City's Expanding Housing Options page says Council permitted multiplexes with up to four units city-wide in May 2023, and six-unit buildings are allowed in the Toronto and East York District and Ward 23. A garden suite or laneway suite can be added under the City's own chapters of the zoning by-law.

What did Bill 23 change for Ontario homeowners who add a unit?

The Environmental Registry notice lists the changes. Up to three units per lot are allowed without a rezoning on serviced urban land. Municipalities cannot set minimum unit sizes beyond the Building Code, cannot require more than one parking space per unit, and cannot charge development charges, parkland dedication or cash in lieu for those units. Residential projects of up to 10 units are exempt from site plan control.

Do additional residential units pay development charges in Ontario?

Not under Bill 23's rules for the second and third unit on a lot. The Province's Environmental Registry notice on the More Homes Built Faster Act says municipalities are prohibited from applying development charges, parkland dedication or cash-in-lieu requirements to those additional residential units. Toronto has its own rules for a fourth, fifth or sixth home in a multiplex, which are in the development charges guide for builders.

Does site plan control apply to a fourplex in Toronto?

No. Bill 23 exempted all aspects of site plan control for residential development of up to 10 units, according to the Province's Environmental Registry notice on the Planning Act changes. Site plan control is the City's review of how a building sits on its site. A duplex, triplex, fourplex or sixplex goes to a building permit, and the City still checks it against the zoning by-law and the Building Code.

What did Bill 185 change for small homes in Ontario?

Bill 185, the Cutting Red Tape to Build More Homes Act, 2024, received Royal Assent on June 6, 2024. The Environmental Registry decision says it gave the Minister power to remove zoning barriers to small multi-unit buildings, such as limits on lot coverage and on bedrooms per lot. It also removed minimum parking for buildings in Major Transit Station Areas, except bicycle parking, and limited appeals of zoning by-laws.

Can neighbours appeal a Toronto zoning by-law after Bill 185?

Fewer people can. The Province's decision notice on Bill 185 says appeal rights for official plans, official plan amendments, zoning by-laws and zoning by-law amendments were limited, and lists who keeps them: landowners whose land the matter applies to, operators of certain facilities near employment areas, aggregate licence holders, NAV Canada and certain airport operators, and public hospitals. Bill 23 had already limited third-party appeals of minor variances and consents.

What is Ontario's 10 percent setback rule?

It is a change to Ontario Regulation 545/06 that implemented Bill 17, the Protect Ontario by Building Faster and Smarter Act, 2025. The Environmental Registry decision of November 24, 2025 says a proposal within 10 percent of a required setback is permitted as-of-right. The Province's own example: a required 5 metre front setback would work as 4.5 metres. It applies to urban residential land outside the Greenbelt Area.

Does the 10 percent setback rule mean I skip the Committee of Adjustment?

For that setback, on eligible land, yes. The Province's notice says the change reduces minor variance applications, because a proposal within 10 percent of the required setback no longer needs one. Land excluded from the rule includes hazardous lands and land near shorelines and railways. Any other zoning standard the design misses, such as height or floor area, still needs a minor variance from the Committee.

Which lands are left out of Ontario's additional residential unit rules?

The Environmental Registry decision on the changes to Regulation 299/19 says the new performance standards apply to urban residential land that permits up to three units per lot, and do not apply to rural areas or to settlement areas without full municipal servicing. Bill 23's three units per lot also apply only in settlement areas with full municipal water and sewage services. Toronto's residential areas are serviced urban land.

Can a city set a minimum size for a basement apartment in Ontario?

Not beyond what the Building Code sets, for additional residential units under Bill 23. The Province's Environmental Registry notice on the Planning Act changes lists minimum unit sizes among the requirements municipalities cannot impose on these units. The Building Code still sets rules for ceiling height, exits, fire separation and windows, which the City checks at the building permit stage.

Why do Ontario's housing laws change both the Planning Act and the City of Toronto Act?

The Planning Act sets the rules for land use planning in every Ontario municipality, and the City of Toronto Act, 2006 sets out Toronto's own powers. The Province's Environmental Registry notices for Bill 23 and Bill 185 list changes to both laws, so a rule written for Ontario municipalities also applies in Toronto. Check both when a news story says a provincial rule applies to Toronto.

Sources

  1. Proposed Planning Act and City of Toronto Act Changes (Bill 23, More Homes Built Faster Act, 2022), ERO 019-6163. Government of Ontario, Ministry of Municipal Affairs and Housing, Environmental Registry of Ontario. Decision posted December 19, 2022. Accessed November 17, 2026.
  2. Changes to Ontario Regulation 299/19: Additional Residential Units, ERO 019-9210. Government of Ontario, Ministry of Municipal Affairs and Housing, Environmental Registry of Ontario. Decision posted December 4, 2024. Accessed November 17, 2026.
  3. Removing Barriers for Additional Residential Units, ERO 019-8366. Government of Ontario, Ministry of Municipal Affairs and Housing, Environmental Registry of Ontario. Decision posted December 4, 2024. Accessed November 17, 2026.
  4. Planning Act, City of Toronto Act, 2006 and Municipal Act, 2001 changes (Bill 185, Cutting Red Tape to Build More Homes Act, 2024), ERO 019-8369. Government of Ontario, Ministry of Municipal Affairs and Housing, Environmental Registry of Ontario. Decision posted June 20, 2024. Accessed November 17, 2026.
  5. Proposed Planning Act and City of Toronto Act, 2006 Changes (Schedules 3 and 7 of Bill 17), ERO 025-0461. Government of Ontario, Ministry of Municipal Affairs and Housing, Environmental Registry of Ontario. Decision posted June 25, 2025. Accessed November 17, 2026.
  6. Proposed Regulation: As-of-right Variations from Setback Requirements, ERO 025-0463. Government of Ontario, Ministry of Municipal Affairs and Housing, Environmental Registry of Ontario. Decision posted November 24, 2025. Accessed November 17, 2026.
  7. Expanding Housing Options in Neighbourhoods. City of Toronto. Modified September 2, 2026. Accessed November 17, 2026.

Planning and development potential is property-specific and subject to zoning, approvals, site conditions, municipal review and other due diligence. This guide gives general information. For legal, tax or financial advice, ask your own lawyer and accountant.

More in Missing Middle

Talk About Your Property

Bring the lot, the address or the question. I review the zoning and the numbers with you.

Get in touch